Toggle menu

Apply for a Scaffold Permit

Apply for a Scaffolding Permit Contact Roads (opens new window)


When applying for a Scaffold Permit, you must allow a minimum period of 28 working days for the application to be processed before making contact with us.

Please note that all scaffold applications require a Glasgow City Council Lighting report which may result in additional costs and/or works to your scaffold.

You also have to pay for the permit before we'll consider your application and our charges can be found in the Book of Charges.

What is a scaffold permit?

If you propose to place a scaffold on the public road or footway there is a requirement under the Roads (Scotland) Act 1984 to obtain permission from the local Roads Authority.

Traffic and pedestrian management will be required when placing apparatus on the public road

Traffic management can include signing and guarding, parking suspensions, traffic control measures or even full road closures. In all cases, traffic management equipment must be deployed, maintained and removed by qualified personnel. Permit applicants who are not suitably qualified should contract out this duty to accredited traffic management contractors. The following legislation applies in the use of traffic management:

  • The Road Traffic Regulation Act 1984 (as amended)
  • New Roads and Street Works Act 1991
  • Traffic Signs Manual, Chapter 8 (as amended)
  • The Traffic Signs Regulations and General Directions 2016
  • Safety at Street Works and Road Works - A Code of Practice 201

 

Temporary Traffic Regulation Order (Road Closure, Parking Suspension)

If a road closure or other temporary traffic regulation order is required to support the works, allow a processing time of up to three months.

A separate request must be made to Glasgow City Council Roadworks Control Unit directly for a temporary traffic regulation order.

Please see attached guide for Temporary Traffic Regulation Orders (TTRO's). This guide explains the cost, process and time scales involved for each type of order.

As most traffic orders are disruptive, it is imperative that the public is provided with sufficient warning of an impending order.

A period of on street noticing will be required, prior to the works start date. This noticing will be undertaken by the applicant directly.

For some TTRO's an advert must also be placed in the local press. This noticing period is a legal requirement, and is needed to allow people affected by your works, sufficient time to make alternative arrangements.

General Requirements to Support an Application

The following plans are required to be provided to support an application. There could be a delay in processing your application if the plans are not supplied or there are issues when any supplied plans.

  1. A basic layout plan/sketch to be provided for all road occupations.
  2. A detailed plan must be provided for major/long term occupations of the carriageway and/or footways.
  3. Plans of the traffic management proposals must be provided for approval.
  4. Detailed elevation drawings must be provided for a scaffold application

 

Related Content

Related Documents

Related Links

Related Articles

 

Last modified on 25 June 2024

Share this page

Share on Facebook Share on Twitter Share by email