Toggle menu

Ruchill: Bilsland Drive

UPDATE (SEPTEMBER 2021):

Following an  independent review (PDF) [6MB] (opens new window)  in September 2021 which considered whether long-term sustainability and active travel benefits could be realised by retaining measures - all Spaces for People cycle lanes, including the one noted below will become permanent.

Ruchill: Bilsland Drive

Project:

Bilsland Drive pop up cycle route

Ward:

Ward 16 Canal.

Location:

Bilsland Drive.

Expected Work Start Date:

24th August 2020

Expected Work Completion Date:

13th September 2020

Measure(s):

Introduction of nearside with flow cycle lanes in both directions, with segregation where possible. This section of work will consist of Bilsland Drive from the canal in the west to Balmore Road in the East.

Jpeg

Jpeg

Jpeg

Jpeg

Last modified on 10 May 2023

Share this page

Share on Facebook Share on Twitter Share by email